How to Get Prequalified to Work for DOT
Originally published on February 16, 2026
State highway projects, bridge reconstruction and major roadway improvements represent some of the most stable revenue opportunities in construction. These Department of Transportation contracts provide steady work through economic cycles that leave private sector builders searching for projects. But there’s a gatekeeper: DOT prequalification.
This isn’t a simple registration process. State transportation agencies thoroughly evaluate contractors before allowing them to bid on publicly funded infrastructure work. Your prequalification rating determines the maximum contract value you can pursue, which directly shapes your growth potential in the public sector. Understanding what agencies look for and how to position your firm makes the difference between accessing these opportunities and watching competitors secure them instead.
What DOT Prequalification Evaluates
Each state runs its own prequalification program with specific requirements. Florida requires prequalification for contractors bidding on road, bridge or public transportation construction contracts greater than $250,000. The specifics vary, but most programs examine similar aspects of your business.
Financial stability sits at the foundation. State agencies need contractors who can fund operations through the payment cycles typical of public work, which often differ significantly from private project timelines. They calculate your working capital and use it as a key factor in determining your maximum prequalification rating.
Your documented project experience matters equally. Agencies want evidence that you’ve successfully completed work similar in scope and complexity to what you’re bidding on. This means maintaining detailed records of past projects with contract values, descriptions, completion dates and owner contact information that evaluators can verify.
Safety performance also affects your rating. State agencies review your OSHA recordable incidents and examine your experience modification rate, which compares your workers’ compensation claims to industry averages. An EMR of 1.0 represents the industry standard. Poor safety records limit your prequalification rating or can disqualify you entirely. Strong safety performance signals that you manage risk effectively.
Bonding capacity represents another critical element. Surety companies issue the performance and payment bonds that guarantee project completion and protect subcontractors and suppliers. Your bonding capacity must support the contract values you want to pursue, and surety companies base their decisions on many of the same financial factors that DOTs evaluate.
Build Financial Strength That Gets You Qualified
Most state DOTs require audited or reviewed financial statements prepared according to Generally Accepted Accounting Principles. These need to come from a certified public accounting firm and meet specific standards that give state evaluators confidence in the numbers. If your current financial reporting consists of basic internal summaries, you’ll need to upgrade your approach before applying for prequalification.
Working capital drives much of the prequalification calculation. This figure represents your current assets minus current liabilities and shows your ability to fund operations, pay your obligations and handle the cash flow patterns of public projects. State agencies apply formulas that use your working capital as a baseline, then factor in other elements like bonding capacity and experience to arrive at your maximum contract rating.
Job costing accuracy matters more than many contractors realize. State agencies and surety companies want to see that you track costs and revenue by individual projects rather than using company-wide accounting that obscures project-level performance. Clear job costing demonstrates that you understand which projects make money, where costs run high and how to price work accurately. This visibility gives evaluators confidence in your financial management.
Revenue recognition practices also draw scrutiny. Your accounting methods need to properly match revenue with work performed and costs incurred. Methods that recognize revenue too aggressively or that don’t align with project progress raise red flags about financial management quality. Getting this right requires understanding both accounting standards and construction industry practices.
Make Your Experience Count
State agencies verify the project experience you claim. They contact owners, review completion documentation and check whether your role on projects matches what you’ve stated. Inflating experience or misrepresenting your involvement will disqualify you, often permanently.
Focus on work classifications where you have genuine, documented experience. State agencies typically assign different prequalification ratings for different types of work. Your experience with asphalt paving might qualify you strongly in that category while your lack of structural work limits you in bridge construction. Trying to qualify for work types where you lack relevant experience wastes time and weakens your credibility.
Insurance, Licensing and Safety Performance
Insurance requirements for DOT work exceed what most private clients require. You’ll need adequate general liability coverage, workers’ compensation meeting state requirements and automobile liability for company vehicles. State agencies specify minimum coverage limits and typically require being named as additional insured parties on your policies. Make sure your insurance agent understands public sector requirements before you apply.
Active, appropriate licenses are mandatory. General contractor licenses don’t automatically qualify you for specialized work on DOT projects. Your firm and key supervisory personnel need proper certifications for the specific project types you want to bid on. Verify your licensing status before investing time in the prequalification process.
It’s important to note that safety records carry real weight. An experience modification rate above 1.0 indicates worse-than-average safety performance and limits your prequalification rating. A rate below 1.0 demonstrates strong safety management and strengthens your application. Also, if your safety record needs improvement, try addressing it before pursuing DOT work. Implementing systematic safety programs, providing regular training and maintaining equipment properly all contribute to better safety performance.
Get Ready to Apply
Start getting ready to apply by assessing your current financial reporting against DOT standards. Many contractors discover their accounting practices work fine for private projects but don’t generate the documentation state agencies require. It is advised to address these gaps before you apply rather than scrambling to produce records during the evaluation process.
Another thing that will help is to build your relationship with surety companies early. They can explain what bonding capacity they’ll extend based on your financial position and what improvements might increase those limits. Since bonding capacity affects your prequalification rating, understanding your bonding potential helps you set realistic expectations.
In addition, organize your project documentation systematically. Create files for each major project with original contracts, change orders, final payment records, completion photos and owner references. This preparation streamlines the application process and demonstrates the organizational capability that agencies value.
Finally, most states require annual prequalification renewal with updated financial statements and current insurance and bonding documentation. Your rating can change based on your firm’s performance and financial health. Maintaining strong financial controls and operational compliance keeps your prequalification active and positions you for rating increases as your firm grows.
Position Your Firm for Public Sector Success
DOT prequalification requires more preparation than most contractors initially expect. The financial documentation standards, experience verification and bonding requirements all demand attention to detail and strong business systems. Contractors who succeed in public sector work treat prequalification as a strategic initiative that requires time and investment.
At James Moore, we work with construction firms to build the financial systems and documentation that support successful DOT prequalification. Our team understands what state agencies look for and how to position your firm for growth in public infrastructure work. Contact us to discuss how we can help you access the opportunities that prequalification makes possible.
All content provided in this article is for informational purposes only. Matters discussed in this article are subject to change. For up-to-date information on this subject please contact a James Moore professional. James Moore will not be held responsible for any claim, loss, damage or inconvenience caused as a result of any information within these pages or any information accessed through this site.